temperatures at night have dropped below zero since late october. harbin petrochemical corp has made early arrangements for safety precautions in the winter to include clearing up safety hazards and self-examinations.
meanwhile, two plants have conducted specific inspections and taken responsibility to maintain devices’ safety.
the corporation set up precautions for maleic anhydride, phthalic anhydride and phenol-acetone devices. during the winter, each workshop is required to inspect ice and snow on interior and exterior floors of the plant area, as well as the stairs, and if there is any sliver thaw on the eaves.
the corporation launched an emergency drill and safety & firefighting training to make full preparations for devices safety in the winter.