bluestar harbin petrochemical arranges winter safety precautions -亚博电竞网

source: china national bluestar (group) co, ltd.
date:2012-11-09

temperatures at night have dropped below zero since late october. harbin petrochemical corp has made early arrangements for safety precautions in the winter to include clearing up safety hazards and self-examinations.

meanwhile, two plants have conducted specific inspections and taken responsibility to maintain devices’ safety.

the corporation set up precautions for maleic anhydride, phthalic anhydride and phenol-acetone devices. during the winter, each workshop is required to inspect ice and snow on interior and exterior floors of the plant area, as well as the stairs, and if there is any sliver thaw on the eaves.

the corporation launched an emergency drill and safety & firefighting training to make full preparations for devices safety in the winter.

media inquiry
fax:010-61958888
 
contact us | site map | legal| links | rss
china national bluestar (group) co,ltd. all rights reserved. without written authorization from china
national bluestar (group) co,ltd. such content shall not be republished or used in any form.
网站地图